National Theatre signs on course
We must give credit where it is due. The signage at the Royal National Theatre on London’s South Bank was a fruitful collaboration between CDT Design and Harkess Ord (DW 18 June). Harkess Ord’s input into the engineering concept, the sign schedule and implementation was invaluable.
Constant consultation and development with architect Stanton Williams ensured that its architectural vision was balanced with functional and operational requirements.
James Alexander
Associate
CDT Design
London WC1
-
Post a comment